Please enjoy the fourth edition of the practice facility update. This update is pretty big--it includes an entirely new structure--so I'm just going to jump right in.
First pic, the traditional wide view looking at the corner of MLK and Front. Notice the addition of a few walls and some new metal work along the whole top of the structure.
A closer view of the wall panels (still on the truck).
The next series was taken walking along the portion of the building abutting Front Street.
In the next two you can see how they are beginning to wall off the side of the practice gym. Hopefully that big opening is for windows, I love natural light in a gym.
And to end the Front Street views, the backside of the practice gym (with a little preview of the new structure on the left side of the frame)
Now on to the new structure, this is located at the back of the complex (closest to the newly-christened BB&T Pavilion which you man know better as the Susquehanna Bank Center, The Tweeter Center, or the E-Center) . I have no idea what the new structure is going to be.
And a picture of the flooring inside the new structure.
Now some closer pictures of the main structure I took from MLK working my way up from the waterfront back towards Front Street
For reference, my previous shots of the main structure's interior are now covered by these walls.
Here are a few pictures of the "back lot" area I profiled last post, including a close up of the retaining wall.
And for those of you who have stuck around, a bonus shots of the full campus from the Delaware River side.
That's all for this update, hope you enjoy!